Job preparation for this project included removal of concrete and asphalt surfaces. Water management was necessary to remove severe standing water by installation of channel drain and outlet tube by filtering water 50 feet away from new constructed drive surface. After careful grading of 5/8″ crushed rock it stabilized base and directed water to a positive flow towards newly installed channel drain. After inspection by the city of Kirkland, new asphalt was installed from the house attaching to the street leaving the customer with a water free parking surface.