Fowler Driveway

Fowler Driveway

Preparation begins with the removal of standing water to prevent sub base from turning to mid during the grading process. Removal of excess gravel and sub base dirt was necessary and disposed of by re-leveling the from yard. Installation of a box drain and drain field was necessary for guidance and management of surface sheet flow from the top of the drive to prevent the from yard from flooding. The base was stabilized with 1 1/4″ crushed rock and then paved carefully guiding water to the newly installed drain and other water flow line outlets.